Nathan heads for the sky.. yea! He’s going to use it!
Sep
01
Sep
01
As it stands..
That’s pretty much how it stands.. Three, 3′ walls, (4′ studs).. and one wall with Crouch and Prone positions to fire on the enemy.
Sep
01
T1-11 ready to fly
Sending up the T1-11.
Sep
01
Adding the walls
Here are two walls all up.. we opt’d to bring the framed wall up, then the T1-11; attach the T1-11 while it was laying down and then stand the walls up.
Sep
01
The Hatch
A look at the hatch..
Sep
01
The Walls..
…waiting to come up. Man.. it looks like a long ways down there!!
Sep
01
Flooring..
Getting ready to yank up the flooring.. 1/2″ pressure treated plywood. We tightened up a C-clamp on the sheet and tied a rope to it and pulled it up to the top.
Sep
01
A homemade ladder.
There it is.. ready for installation..
Sep
01
The rungs..
16′ ladder… 16 rungs.. ok.. 15, i ran out of stock and will add the lower one later.
Sep
01
Ladder stock..
Clamped and ready to drill… a 16′ 2×4 post ladder with 1.25″ dowel rungs.